Nuclear Power

Advent Engineering Services, Inc.
Key staff members at Advent have played an instrumental role in developing, validating, and integrating design basis programs since 1987. Advent recommends the proper establishment and use of design requirements and bases as paramount to not only a successful design process, but to acceptable continuing configuration control. Past relevant experience is critical to reconstituting only the true design requirements and bases. Advent's staff has provided design basis assistance to eight utility clients and relevant experience includes:

  • System DBDs
  • Topical DBDs
  • Design Basis Validations
  • Design Basis Open Item Resolution
  • Configuration Control Assistance
View Advent's Project List


Environmental Qualification (EQ)

Key Advent technical staff members have been instrumental in EQ Program development, maintenance, and enhancements since the early beginnings of EQ as a major issue in 1979. Advent staff is continuing to play a key role in the review, development, and update of EQ-related industry standards. Advent staff has provided EQ assistance to 11 utility clients, including the following services:

  • EQ Program Assessments
  • EQ Documentation and Evaluations
  • Equipment Operability Evaluations
  • Aging Assessments
  • Program Enhancements
  • Test Program Plans, Report Evaluations, and Extrapolation Analyses
  • EQ Program Training

View Advent's Project List


10 CFR 50 Appendix R (Fire Protection)

Key Advent technical staff members have played a major role in assisting client utilities to comply with 10 CFR 50 Appendix R since the early days of its enforcement in 1980, as well as the earlier Branch Technical Position requirements. Advent has assisted 6 clients with the following services:

  • Fire Hazards Analysis
  • Generic Letter 86-10 Evaluations
  • Appendix R Safe Shutdown Analysis
  • Appendix A Compliance Programs
  • Cable Separation and Associated Circuit Analysis
  • Fire Barrier and Penetration Assessments
  • Independent Program Assessments and Self-Assessments
  • Regulatory Compliance Evaluations
  • On-Site Inspection Support
  • Alternate Shutdown Analysis
  • Fire Detection, Suppression and Fire Protection Features Evaluations
  • Design and Licensing Basis Documentation
  • Electronic Program Documentation
  • Program Productivity Aides
  • License Based Program Optimization

View Advent's Project List


New Advanced Nuclear Plant DCD / COL Support

  • Assisted an NSSS vendor in developing a design certification document (DCD) for its advanced nuclear plant design by providing technical and licensing support in the area of accident analysis. Assisting and advising in responding to regulatory questions on the DCD submittal.
  • Acting as Owner representative in reviewing and accepting design, performing construction interface, and resolving licensing issues associated with construction of the first US COL nuclear facility. Other tasks have included developing a normal and accident environmental and seismic condition document, improving calculation process for accepting external design agency calculations, and updating the facility's functional performance specification.
  • Performed focused self-assessment on acceptability of a COL facility's construction-engineering interface.
  • Assisted a Midwest utility in performing research in support of a COL application.

Existing Plant Design Mod 50.59 Evals

  • Qualified to perform 10 CFR 50.59 applicability determinations, screens and full evaluations at multiple plants.
  • Qualified to perform 10 CFR 70.72 evaluations to address potential departures from COL approved design.
  • Performed focused self-assessment on a plant Owner’s 10 CFR 50.59 Program. This self-assessment addressed effectiveness of screens, full evaluations, and related corrective action and provided recommendations.


Nuclear Security Support

  • Provided engineering support to a security upgrade project at a Midwest nuclear facility to address the requirements of NRC orders regarding Design Basis Threat (DBT), which reviewing design requirements and design details relative to the NRC’s DBT order, coordinating 50.54(p) effectiveness reviews with the plant security staff, preparing 50.59 screens for impact on the existing unit, and preparing changes to the UFSAR and Physical Security Plan.
  • Performed a self-assessment of the modification project in the aggregate to verify that all of the DBT Order requirements had been addressed.
  • Chairing an IEEE Standard Working Group 3.2 responsible for updating IEEE Std 692 (Nuclear Station Security Requirements) to latest technology.


FSAR and Other Regulatory Compliance Support

Advent staff members have played a key role in helping clients to respond to regulatory commitments to validate FSARs and assisting with other licensing related efforts and issues. Advent has provided clients with services in the following areas:

  • FSAR Updates and Validations
  • Reportability Evaluations
  • Living FSAR
  • License Renewal (10 CFR 54)
  • Configuration Issues on MOVs, block walls, pipe supports, etc.
  • Technical Support for Station Blackout and other Emergent Regulatory Issues

View "The Case for Infobase Technology in the Nuclear Industry" presented at the ANS 1999 Annual Meeting

View Advent's Credentials for Reviewing 10 CFR 50.59 Evaluations

View Advent's Project List


Major Analyses and Engineering Evaluations

Advent staff members have been specially trained to prepare calculations and reports which emphasize logic, clarity, consistency, and completeness. Our capabilities include:

  • Thermal and Hydraulic Analyses
  • System Performance and Operability Evaluations
  • Room Heat-Up Analyses
  • Electrical and Electronic High Temperature Operability Evaluations
  • Margin Reduction Evaluations
  • Aging Assessments
  • FMEAs, Fault Tree Analyses
  • Stress Analyses
  • Instrument Setpoint Calculations

View Advent's Project List


Emergency Planning

Advent has experience in Emergency Planning, with a focus on evacuation studies involving populations surrounding critical facilities.

Through the use of various techniques, Advent is able to model an evacuation and perform real-time interpretations of the results. These results contribute to the overall analysis performed by our staff for an individual site and it's surrounding area.

Techniques include:
  • Traffic Engineering Analysis
  • Census Data Interpretation
  • Weather Effects Analysis
  • Computational Analysis
Benefits of Real-Time Analysis:
  • Identifying Trouble Spots
  • Recommendations of Alternate Routes